Our safety systems are tailored to site-specific dispersion studies and are designed to limit exposure, provide early detection and enable controlled mitigation. Fogging systems are engineered with nozzle placement and droplet sizing to maximize ammonia absorption and droplet lifetime in the expected wind regimes; systems are typically coupled with automated actuation from gas detectors and manual initiation as part of the site ESD strategy. Scrubbers and neutralization systems are sized to handle plausible release scenarios and include provisions for chemical storage, dosing and spent liquor handling.
Comprehensive gas detection architecture is designed around both fixed-point and open-path sensors, integrated into the PLC/SCADA for escalation, alarms and automatic shutdown logic. Maintenance regimes, test intervals and periodic system drills are documented and aligned to local regulatory expectations. We also advise on PPE, refuge zones and detector calibration programmes to ensure ongoing readiness.